Motor City Casino Hotel - Detroit, Michigan (2008)
General Contractor: Michigan Industrial Group
Contract Amount: $13,836,000.00
Motor City Casino Valet - Detroit, Michigan (2008)
General Contractor: Michigan Industrial Group
Contract Amount: $1,366,500.00
Motor City Casino - Michigan Gaming Board
3rd & 4th Floor Offices - Detroit, Michigan (2008)
General Contractor: Michigan Industrial Group
Contract Amount: $323,250.00
Motor City Casino Parking Deck - Detroit, Michigan (2008)
General Contractor - Michigan Industrial Group
Contract Amount - $143,900.00
Motor City Casino - Emergency Generator and
Slots
Motor City Casino Restaurants -
General Contractor: Motor City Casino
Owner:
Contract Amount:
Restaurants -
$
2,735,000.00
Emergency Generator/Slots - $ 444,300.00
Motor City Casino -
HVAC
General Contractor: Michigan Industrial Group
Contract Amount:
$
489,500.00
MGM Grand Parking Structure - Detroit,
General Contractor: O'Neil/Spencer - joint venture
Owner: MGM Grand
Contract Amount: $ 2,146,000.00
Greektown Casino - Wardrobe Room - Detroit, MI
(2008)
General Contractor: JC Beal Construction
Contract Amount: $28,600.00
General Contractor: Emanuel/Roncelli, LLC
Contract Amount: $ 1,938,000.00
Oakland Twp
General
Contractor: Skanska USA Building Inc.
Contract Amount: $ 673,000.00
General Contractor: Barton Malow
Contract Amount: $ 346,400.00
Clinton Township
General Contractor: Skanska USA Building Inc.
Contract Amount: $ 217,300.00
Henry Ford Macomb Hospital, East-West-North
Service Work Contractor
General Contractor: Henry Ford Macomb Hospitals
Henry Ford Macomb Hospital - MRI - Clinton Township, MI
General Contractor: George W. Auch Company
Contract Amount: $76,100.00
Henry Ford Cottage Hospital - 2nd Floor - Grosse Pointe
Farms, MI
General Contractor: George W. Auch Company
Contract Amount: $72,000.00
Henry Ford Macomb Hospital Cafe - Clinton Township, MI
General Contractor: George W. Auch Company
Contract Amount: $38,000.00
Henry Ford Macomb Hospital - CATH Lab - Clinton Township,
MI (2008)
General Contractor: George W. Auch Company
Contract Amount: $300,850.00
Henry Ford Hospital - West Bloomfield, MI
General Contractor: George W. Auch Company
Contract Amount:
$ 79,500.00
Beaumont Business
Center - Troy, MI
General Contractor: Contracting Resources
Contract Amount:
$
481,300.00
Lapeer County Surgery Center - Lapeer, MI
General Contractor: George W. Auch Company
Contract Amount: $657,000.00
Medstar Ambulance Headquarters
&
Garage -
Clinton
General Contractor: George W. Auch Company
Contract Amount: $ 326,700.00
St. Joseph - ER Expansion
General Contractor: Kirco Construction
Contract Amount: $ 768,000.00
Chesterfield
General Contractor:
George W. Auch Company
Contract Amount: $ 284,300.00
Bon Secours Endoscopy - Grosse Pointe,
General Contractor: George W. Auch Company
Contract Amount: $ 121,000.00
Southfield,
General
Contractor: George W. Auch Company
Contract Amount: $ 82,495.00
General Contractor:
Marcott Builders/Wingate Management
Contract Amount: $ 209,200.00
Clinton
General Contractor: Rockford Construction Company
Contract Amount: $ 1,101,200.00
Botsford Assisted Living Center/Botsford
Commons -
Farmington
General Contractor: A.J. Etkin Construction Company
Owner: Botsford Continuing Care Center Corporation
Contract Amount: $ 413,400.00
Pontiac
General Contractor: George W. Auch Company
Contract Amount: Pontiac -
$
269,100.00
Mt. Clemens -
$
155,000.00
Clinton Township
General
Contractor: Ferlito Construction
Contract Amount: $ 139,300.00
Botsford Continuing
Farmington Hills
General Contractor: A.J. Etkin
Construction Company
Contract Amount: $ 1,595,000.00
Harrington Senior Citizen Complex -
Port Huron
General Contractor: Specialty
Engineering
Contract Amount: $ 455,000.00
Pontiac
General
Contractor: George W. Auch Company
Contract Amount: $ 1,027,000.00
Farmington Hills
Contract Amount: $ 800,000.00

AUBURN HILLS
General Contractor: Terra Nova Industries
Contract Amount: $ 266,000.00
Bass Pro Outdoor World
General Contractor: W.E. O'Neil Construction Company
Contract Amount: $ 2,277,000.00
Bebe's and Maternity Works
General Contractor: James Hunt
Construction
Contract Amount: Bebe's - $ 26,125.00
Maternity Works - $ 14,825.00
Brooks Brothers Fashions
General Contractor: Retail Construction
Contract Amount: $ 31,325.00
General Contractor: Sordoni Skanska Corporation
Contract Amount: $ 627,250.00
Call for Assistance System
General Contractor: Sordoni Skanska Corporation
Contract Amount: $ 250,600.00
For Your Entertainment
General Contractor: Conboy and Mannion Contracting
Contract Amount: $ 190,200.00
Footlocker
General Contractor: Elder Jones Corporation
Contract Amount: $
105,600.00
Johnny Rockets
General Contractor: Terra Nova Industries
Contract Amount: $
57,000.00
Oshmans Super Sports
General Contractor: Sordoni Skanska Corporation
Contract Amount: $ 432,350.00
Toys International
General Contractor: Sergent Construction
Contract Amount: $
82,000.00
Project Owner: Taubman Auburn Hills Limited Partnership
Back to Top
Kroger D691 - Westland, MI (2008)
General Contractor: Bostleman Corporation
Contract Amount: $418,900.00
Kroger D663 - Roseville, MI (2008)
General Contractor: Arco, Inc.
Contract Amount: $150,200.00
Kroger D720 -
General Contractor: Jonna Companies
Contract Amount:
$
466,500.00
Kroger D720 Fixturing .
Kroger D709 Fixturing .
Kroger D651 Fixturing·
General Contractor: The Kroger Company of
Clarkston -
$
86,700.00
Kroger D520 -
Kroger D670 .
Kroger D686 .
General Contractor: Bostleman Corporation
Contract Amount:
Kroger D706 -
General Contractor: F.H. Martin
Construction Company
Contract Amount: $ 533,000.00
Kroger D649 -
Kroger D675 - Waterford,
General Contractor: The Parliament Company
Orion - $502,825.00
Kroger D629 -
General Contractor: Quadrants,
Incorporated
Contract Amount: $ 563,800.00
Kroger D685 -
Kroger D671 .
General Contractor: Jonna Construction Company
Contract Amount:
Kroger D630 -
Kroger D675 -
Kroger D614 -
General Contractor: Bostleman Corporation
Contract Amount:
Kroger D669 -
General Contractor: F.H. Martin Construction Company
Contract
Amount: $ 490,5000.00

Wayne
Contract Amount: $ 1,905,000.00
Polk Elementary Media
Center - Dearborn, MI
General Contractor: National Maintenance
Contract Amount:
$ 62,000.00
Kaplan Career Institute - Detroit, MI
General Contractor: The Monahan Company
Contract Amount: $328,200.00
General Contractor: E. Gilbert
&
Associates
Contract Amount: $ 720,020.00
Clinton
Township
General Contractor: Barton Malow
Contract Amount: $ 734,000.00
Hutchings Elementary -
General Contractor: Clark Construction Company
Contract Amount:
$
951,3400.00
New Visions Unlimited-Oakland Schools -
Farmington Hills
General Contractor: Barton Malow
Contract Amount: $ 292,500.00
General Contractor:
IWC-Cannon Electric, LLC
Contract Amount: $ 2,417,000.00
Ferndale
General Contractor:
Roncelli, Incorporated
Contract Amount: $ 137,700.00
General Contractor: MCS/EV
Contract Amount: $ 1,013,000.00
Plymouth-Canton Schools - Allen and Smith Elementaries -
Canton
General Contractor: TMP Associates
Contract Amount: $ 105,500.00
New Law Elementary -
General Contractor: Jenkins Construction
Contract Amount: $ 1,231,300.00
General Contractor: Emanuel, LLC
Contract Amount: $ 570,000.00
Roseville Community Schools-Service/Lighting
Roseville
General Contractor: Jonna Construction Company
General Contractor: Turner Construction Company
Contract Amount: $ 354,000.00
Lincoln Consolidated Schools -
General Contractor: A.
J.
Etkin Construction Company
Contract Amount: $ 574,000.00
Ann Arbor
General Contractor:
Olympic Corporation
Contract Amount: $ 630,000.00
Walled
West Bloomfield
General Contractor: Auch/Payne-Hickey
Contract Amount:
$
580,642.00

FORD LAND DEVELOPMENT CORPORATION
Creative Industries
Contract Amount: $ 292,155.00
Contract Amount: $ 376,600.00
Campbell & Company
Contract Amount: $ 61,360.00
Ford American Supplier Institute
Contract Amount: $ 170,450.00
Rotunda Court IV
Contract Amount: $ 96,500.00
Ford Aerospace - Phase I
Contract Amount: $ 355,000.00
Ford Aerospace - Phase II
Contract Amount: $ 281,135.00
Climate
Contract Amount: $1,535,000.00
Fibercraft/Descon
Contract Amount: $ 126,200.00
Ford Simultaneous
Contract Amount: $ 249,110.00
Ford Air Transportation Facility
Contract Amount: $ 293,975.00
Rotunda Court II, III & IV Site Dev.
Contract Amount: $ 190,800.00
Fairlane Club Renovation
Contract Amount: $ 108,890.00
Geometric
Contract Amount: $ 132,960.00
Contract Amount; $ 139,905.00
General Contractor: John M. Olson Company
General Contractor: MICCO, LLC
Contract Amount: $168,800.00
Wal-Mart #4540 - Fowlerville, MI (2008)
General Contractor: MICCO, LLC
Contract Amount: $850,000.00
Sams Club
# 6657 -
Novi,
General Contractor: MICCO, LLC
Contract Amount: $ 878,000.00
White
General Contractor: TH Marsh Construction Company
Contract Amount: $ 223,700.00
Novi Shoppes at The Trail-
Novi,
General Contractor: Sky Development
Contract Amount: $ 597,200.00
Target 896 - Commerce Township,
General Contractor: Gioffre Companies, Inc.
Contract Amount: $ 495,300.00
Salvation Army - Warren,
General Contractor: FH Martin Construction Company
Contract Amount:
$
733,900.00
Von Maur - Briarwood Mall - Ann
Arbor, Michigan
General Contractor: Russell/Pepper
Construction, LLC
Contract Amount: $ 1,640,000.00
Wal-Mart - Lyon Township, Michigan
Wal-Mart - Shelby Township,
General Contractor: Roncelli,
Incorporated
Contract Amount:
Shelby
Whole Foods Market - Ann Arbor,
General Contractor: F.H. Martin Construction
Company
Contract Amount: $ 1,920,400.00
Salvation Army - Detroit,
General
Contractor: O'Brien
Contract Amount: $ 214,400.00
Farmer Jack #614 - Troy,
General Contractor: Bostleman Corporation
Contract Amount: $
667,500.00
Galyan's - Novi,
General Contractor: Pepper Construction
Contract Amount:
$
1,166,100.00
Super K-Mart - Bonnie
Brook -
General
Contractor: Etkin Skanska
Contract Amount: $ 1,797,750.00
AJ Wright -
General Contractor: ACI Construction
Contract Amount: $ 171,000.00
Kohl's Remodel/Expansion -
General Contractor: Bostleman
Corporation
Contract Amount: $ 452,100.00
Linens ~ Things -
Linens ~ Things -
Linens ~ Things -
Linens ~ Things -
General Contractor: Commercial
Contractors
Contract Amount:
Sterling
Heights
Sears - Summit Place Mall -
General Contractor: Larson-Danielson
Construction Company
Contract Amount: $ 1,183,000.00
Sears -
Lincoln Park
Twelve Oaks Mall - Novi,
General Contractor: Voorheis Construction
Contract Amount:
Lincoln Park
Novi
Jeepers, Inc. Wonderland Mall -
Macomb Mall -
General Contractor: Hanlin-Rainaldi,
Incorporated
Contract Amount:
PETSMART -
General Contractor: Olympic
Corporation
Contract Amount: Northville - $
216,000.00
Southfield
Lowes/Office Max--Jackson Crossing,
General Contractor:
Freeman-Darling Construction Company
Contract Amount: $ 1,002,500.000
Best Buy -
General Contractor: Olympic Corporation
Contract Amount:
$
442,700.00
Builders Square II -
General Contractor: Freeman-Darling Construction Company
Contract
Amount: $ 650,900.00
Builders Square -
General Contractor: Denoyelles Company
Contract
Amount: $ 646,700.00
Super K-Mart -
General Contractor: Project Advisors Consortium
Contract Amount: $ 1,373,075.00
General Contractor: Schoensheck, Incorporated
Contract Amount: $ 816,470.00
Sam's Club Warehouse -
General Contractor: Roncelli, Incorporated
Contract Amount: $ 264,459.00
Target at Birchwood Mall -
General Contractor: Granger
Construction Company
Contract Amount: $436,000.00
F
&
M Distributors -
General Contractor: Fox Corporation
Contract Amount:
AMC Plex 20 .
General Contractor: Bovis Construction
Contract
Amount: $ 1,495,600.00
Showcase Cinema·
General Contractor: Roncelli,
Incorporated
Contract Amount:
$
1,533,860.00
Showcase Bluesky Cinema·
General Contractor: Roncelli,
Incorporated
Woodward Garden Theater - Detroit, MI
General Contractor: The Monahan Company
Contract Amount:
$
362,100.00
Back to Top
Chili's #1417 - Livonia, MI
Chili's #1422 - Warren, MI
General Contractor: Podojil Builders
Contract Amount: Livonia - $166,000.00
Warren - $145,000.00
General Contractor: Bostleman
Corporation
Contract Amount: $ 250,800.00
Andiamo's Riverfront (4 Star) - Detroit, Michigan
General Contractor - Roncelli, Incorporated
Contract Amount - $ 255,200.00
Johnny Carino's Italian Restaurant -
General Contractor:
Contract Amount: $ 129,000.00
Max & Erma's Restaurant -
General Contractor: Fortney
&
Weygandt
Contract Amount: $ 131,100.00
Red Lobster Renovations
Ten (10) locations (Ann Arbor, Dearborn Heights, Livonia, Madison
Heights, Novi, Rochester Hills, Southgate, Sterling Heights, Warren
and Westland, Michigan)
General Contractor: Haley Construction
Contract Amount: $ 102,000.00
Red Lobster Renovations
Seven (7) locations (
General Contractor: Zastrow-Nasset Construction Company
Contract Amount: $253,000.00
Red Lobster Renovations
Three (3) locations (Novi,
General Contractor:
Elder-Jones, Incorporated
Contract Amount: $ 84,050.00
Red Lobster Renovations
Nine (9) locations (
General
Contractor: Haley Construction
Contract Amount: $267,300.00
A&W Restaurant·
Contract Amount:
Southfield
Troy
Meade Lexus of Lakeside·
General Contractor: John M. Olson
Company
Contract Amount: $ 295,500.00
AI Bennett Ford· Grand
General Contractor: John M. Olson
Company
Contract Amount: $ 172,500.00
General Contractor:
Contract Amount: $ 126,460.00
Lakeside
General Contractor: John M. Olson
Company
Contract Amount: $ 305,400.00
Dick Huvaere's
General Contractor: John M. Olson Company
Contract Amount: $ 159,150.00
Westar Dodge·
General Contractor: John M. Olson
Company
Contract Amount: $ 185,000.00

Art Van Furniture·
General Contractor: Roncelli,
Incorporated
Contract Amount: $ 545,500.00
Art Van Corporate Office Renovation·
Art Van Furniture·
General Contractor: Olympic Corporation
Contract Amount: 1995-$ 207,200.00
1993- $ 300,000.00
Scott Shuptrine Furniture·
General Contractor: John M. Olson
Company
Contract Amount: $ 233,702.00
Arab Community Access Center - Dearborn, MI (2008)
General Contractor: Sorensen Gross Construction
Services
Contract Amount: $431,000.00
UAW Service - Detroit, MI (2008)
General Contractor: UAW GM Human Resources
Jewish Family Services -
Contract Amount: $ 375,500.00
GDX Automotive -
General Contractor: Synergy Group
Contract Amount: $ 569,300.00
Huron Precision Products -
General Contractor: Schonsheck, Incorporated
Contract Amount: $ 1,513,700.00
Maple Corporate Offices -
General Contractor: Synergy Group
Contract Amount: $ 988,400.00
Crown Tool/JAC Products -
General Contractor: Synergy Group
Incorporated
Contract Amount: $ 319,850.00
Delphi R
&
D Lab Relocation -
General Contractor: Arcadis Giffels Technologies
Contract Amount: $ 1,560,550.00
Splitrock Services -
General Contractor: Embree Construction
Contract Amount: $ 158,250.00
Clover Communications -
General Contractor: Quadrants,
Incorporated
Contract Amount: $ 1,700,000.00
Active Tool Assembly Expansion -
Clinton Township
General Contractor: Roncelli,
Incorporated
Contract Amount: $ 1,640,000.00
GM
Warren
General Contractor: DeMaria Building Company
Contract Amount: $ 870,500.00
Active Metal Forming Technologies -
Clinton Township
General Contractor: Roncelli,
Incorporated
Contract Amount: $ 2,190,500.00
Active Tool -
General Contractor: Roncelli,
Incorporated
Contract Amount: $ 210,500.00
General
Contractor: George W. Auch Company.
Contract Amount: $ 386,000.00
General
Contractor: John M. Olson Company
Contract Amount: $1,190,825.00
General
Contractor: John M. Olson Company
Contract Amount: $ 1,424,765.00
General Contractor: Turner Construction
Contract Amount: $ 1,501,600.00
Comerica Bank -
General Contractor: Dumas
Construction Services
Contract Amount: $ 107,000.00
Comerica Bank
# 544 -
General Contractor: Cornerstone
Building Group
Contract Amount: $ 135,000.00
Comerica Bank Branch 315 -
General Contractor: Olympic
Corporation
Contract Amount: $ 70,000.00
NBD - 11th Floor Renovation -
General Contractor: George W.
Auch Company
Contract Amount: $ 123,900.00
NBD - 10th Floor Renovation -
General Contractor: Roncelli,
Inc.
Contract Amount: $ 202,730.00
George George Memorial Park - Clinton Township, MI (2008)
General Contractor: Glenrio & Associates
Contract Amount: $246,700.00
General Contractor: LS Brinker
Contract Amount: $1,702,000.00
General Contractor: VCC
Contract Amount: $ 1,702,000.00
Novi Shoppes at The Trail - Novi, MI
General Contractor: Sky Development
Contract Amount: $597,200.00
Shops at Waldon Pond -
General Contractor: The Parliament
Company
Contract Amount: $ 117,000.00
Twelve Oaks Mall Renovation -
General Contractor: A.J. Etkin Construction Company
Contract Amount: $ 728,500.00
Birchwood Mall -
General Contractor: General Growth Development
Contract Amount: $1,126,788.00
Universal Mall Expansion -
General Contractor: John M. Olson
Company
Contract Amount: $ 666,000.00
General Contractor:
Fox Corporation
Contract Amount: $ 290,000.00

MEIJER, INCORPORATED
Meijer #27 - Ypsilanti, Michigan (2008)
General Contractor: Hurst Industries
Meijer # 122 Remodel -
General Contractor: Acme Enterprises
Meijer # 57 Remodel - Rochester Hills, Michigan
Meijer # 123 Remodel - Southgate, Michigan
General Contractor: Siwek Construction Company
Meijer # 32 Remodel - Canton, Michigan
Meijer #227 - White Lake Township, Michigan
Meijer #208 - Lincoln Park, Michigan
Meijer #68 -
Meijer #32 -
Meijer #185 -
Meijer #177 - Washington Township, Michigan
Meijer #163 - Port Huron, Michigan
General Contractor: Rockford Construction Company
Meijer #173 -
General Contractor: Elzinga
&
Volkers, Incorporated
Meijer #63 -
General Contractor: Granger Construction
Remodel: Roncelli, Incorporated
Meijer # 140 -
General Contractor: A.J. Etkin Construction Company
Meijer #145 -
General Contractor: Pioneer Incorporated
Meijer Gas Stations -
Meijer Store #105 -
General Contractor: John M. Olson
Company
Meijer Store #53 -
General Contractor: DeYoung
&
Bagin
Meijer Store #57 -
General Contractor: Erickson
&
Lindstrom
Value of all completed Meijer projects - $2
Kids "R" Us
General Contractor: George W. Auch
Company
Contract Amount: $ 567,300.00
Kids "R" Us Conveyor System -
General Contractor: Key Handling Systems Incorporated
Contract Amount: $ 293,975.00
Toys "R" Us
General Contractor: George W. Auch Company
Contract Amount: $ 709,612.00
. Kids "R" Us -
General Contractor: George W. Auch Company
Contract Amount:
Bel-Air
$
110,300.00
Livonia
Toys "R" Us and Kids "R" Us -
General Contractor: Walbridge Aldinger Company
Contract Amount: $ 282,000.00
Kids "R" Us -
General Contractor: John M. Olson Company
Contract Amount: $ 78,900.00
Candlewood Hotel -
General Contractor: Weis Builders
Contract Amount: $ 587,300.00
General Contractor: Weis
Builders
Contract Amount: $ 583,000.00
Midway Motor Lodge -
(Phase 1 & Phase 2)
General Contractor:
Phase 1: John Cooley Company
Phase 2: Morse/Diesel, Incorporated
Contract Amount:
Phase 1: $ 450,000.00
Phase 2: $ 912,000.00